|
Talk about this article... Water Horse Resource's Export Application for Proposed Water Pipeline from Utah to Colorado's Front Range June 05, 2018 HEARING HAS BEEN CONCLUDED
ORDER OF THE STATE ENGINEER
###
The public is invited to attend the first administrative hearing for this water export application for a diversion from the Green River and a pipeline to carry water to the communities of Colorado's Front Range. The pipeline will basically follow Interstate 80 through Wyoming and then the Interstate 25 corridor through Colorado. The withdrawal is 50,000 acre-feet per year and includes hydroelectric power generation (pumpback projects) and the installation cost, at minimum, will likely be over 4 billion dollars; $1,600 per acre foot for a time period of 50-years. In 2012, the Federal Energy Regulatory Commission denied the application for a watr pipeline from the Green River to the Front Range. CLICK HERE for more information. INFORMAL HEARING BEFORE UTAH DIVISION OF WATER RIGHTS Date: Wednesday, Novenber 7, 2018Time: 9:00 AM Address: Room 1050; 1594 West North Temple; Salt Lake City, Utah 84114 The entire administrative record for this application is located on the website of Utah Division of Water Rights HERE. The website for Water Resources LLC is located HERE NEWS
DOCUMENTS
NEWS
PROTEST LETTERS
DOCUMENTS FROM APPLICANT TO UTAH DIVISION OF WATER RIGHTS
Talk about this article... |
| ||||