|
Talk about this article... Colorado River System Mid- to Long-term Projections September 18, 2020 Reclamation’s Upper and Lower Colorado Regions utilize a suite of reservoir operations models for short-, mid-, and long- term planning. The 24-Month Study, the Mid-Term Operations Model (MTOM), and the Colorado River Simulation System (CRSS) are comprehensive models of the Colorado River system implemented in the commercial river modeling software called RiverWareTM developed by the Center for Advanced Decision Support for Water and Environmental Systems (CADSWES) at the University of Colorado. The models are updated and maintained continually by Reclamation’s Upper and Lower Colorado Regions. NEWS
2018, April - Colorado River System 5-Year Projected Future Conditions by the Bureau of Reclamation in the Lower Colorado Division. Part One - General Modeling Information: (1) Overview; (2) Future Hydrology; (3) Lake Mead and Lake Powell Coordinated Operations; (4) Model Assumptions
Part Two - Colorado River System 5-Year Projected Future Conditions: (1) Overview; (2) Modeling Approach; (3) Future Projections
2020, September - Colorado River System 5-Year Projected Future Conditions by the Bureau of Reclamation in the Lower Colorado Division.
Part One - General Modeling Information:
Part Two - Colorado River System 5-Year Projected Future Conditions:
Part Three - Colorado River System Projected Future Conditions - Alternative Future Hydrology Scenarios:
Other Information
REFERENCES Talk about this article... |
| ||||